

Projects (as Main Contractor)
New Built Works Construction:
Residential Building, No. 4 Kent Road, Kowloon Tong
Residential Building, No. 147 Waterloo Road, Kowloon Tong
Composite Development at No.245-247,Tai Kok Tsui Road, Kowloon
Commercial Building, 40 Kimberley Road, Tsim Sha Tsui
Residential Building Works, 11 Sha Tin Ridge Road, Sha Tin
Seng Tak Central School Building Project, New Clear Water Road, Kowloon
Commercial Development 24A &24B Granville Road, Tsim Sha Tsui
No.8-12, Yuen Long Pau Cheung Square, Yuen Long
E&M Works Construction:
Sha
Redecoration Work
Kau To Shan and Hong Lok Yuen South Bay, Shouson
和(hé)明以(yǐ)主(zhǔ)承(chéng)建(jiàn)商的身(shēn)份完(wán)成了
1.尖(jiān)沙咀金巴利道40號商業大廈建築工程(整單所有項目)
2.香港觀塘新清水灣道重(zhòng)置(zhì)香港扶幼會盛德(dé)中心學校建築工程(chéng)(整單所有項(xiàng)目)
3.香港沙田嶺道
4.沙田火炭(tàn)數據中心(xīn)工程(機電設備連裝修)
5.九(jiǔ)肚山(shān)以及(jí)康樂園(yuán)南灣、壽臣(chén)山、加列山等(děng)豪(háo)宅裝修等
6.大角咀(zuǐ)道245-247號住宅大樓建築工程(整單所有項目)
7.九龍塘根德道4號(hào)單幢式住宅
8.九龍塘窩(wō)打老道147號單幢式住宅
9.尖沙(shā)咀加連威老道24A&24B大廈
11.旺角上海街445號住宅(zhái)大
12. 屯門環保園廢(fèi)紙回(huí)收廠房及其(qí)他相(xiāng)關(guān)的發展項目(mù)之P1地段
Projects (as Sub Contractor)
Civil Engineering:
Hong Kong's Siu Sai Wan Park Drainage Project,
Government Development Department's Tin Shui Wai Wooden Bridge Project,
Phase III Reclamation 2009/19 project of the steel railing project, airport railway depot steel structure.
A&A Works Construction:
The renovation project of Sha
Steel Structure Engineering
Shanghai Lu Pu Bridge Steel Structure Engineering.
Other projects completed by the Company include:
Shatin Vista Paradiso external area ; site wooden & steel decoration work
土女上男下啪啪的视频,爸爸妈妈啪啪啪视频,娇喘啪啪啪视频,在楼道里啪啪视频程
其他工程